54/S/24/Su/Dg/A/0003 - Supply With Installation And Commissioning Of Two (2) Air-Cooled Water Chillers, With Total Heat Recovery, To Replace The Existing Units (No. 2 And 3), Of The Insular-Materno Infantil University Hospital Complex Of Gran Canaria